Terms & Conditions
Price:-
- Quoted prices are applicable for this proposal only, any modifications may result in a change of prices.
- The quoted rates are an estimate based on current design and sizes.
- Designs are liable to change till the sign off the design phase.
- Depending on the exact actual measurements on the site prices may change.
- Deep cleaning for your home post-handover can be provided by Inner Design at an extra cost as
below:
|
» 800-900SFT Flat = TK 7500 + taxes. |
|
» 1000-1200SFT Flat = TK 9500 + taxes. |
|
» 1200+ SFT = 10TK. per SFT |
- Floor covering of your existing flat will be charged extra at TK. 10 per SFT / this will be done by default by Inner Design added to your bill at the time of going to production as per actual site measurements.
- Painting and light suggestion will only be given if you book the same services with us.
- High Quality 3D Render services can be provided by Inner Design on extra cost.
- If service lift isn’t operational then uplifting charges of 10000 TK. will be applicable till 5th floor. Beyond that as per floor count charges will be applicable.
- Any lamination beyond the price of 2000 TK /sheet. will be charged extra.
- Soft closer hinz & channel will be charged extra.
- Any extra accessories, Carcass top, lights, electrical materials, Point shifting or any other extra work will be charged as per actual.
- Based on Design Rates May differ for each and every Unit.
- PVC Sheet, Veneer, Digital Lamination, Lacquer Glass and Acrylic sheet will be charged extra as per the actual rate.
- All kind profile handle, Profile shutter cost will be charged extra.
- Extra Drawer/Basket Or any other accessories will be charged extra as per actual.
- Time of installation all the internal house wall may get some damages and for that you need to do one coat of painting after completion of woodwork.
- Inner Design is able to process your final order and start production only post a 55% payment, Key and work permission letter.
Below work can be done at extra cost:-
- Civil work (Breaking existing partitions, walls or counters making)
- Plumbing material & services
- Electrical points shifting
- Electrical Appliances and/or installation
- Chimney installation & ducting
- Wall tiles and installation
- Cornice / Mouldings & Pelmet
- Kitchen & Cabinet Spotlights
- Hanging accessories
- Copper gas pipe and installation
- False Ceiling and Furniture lights
- Stone Work
- Wall Core Cutting
- Deep Cleaning
Production & Installation Schedule:-
|
Project Value |
Buffer time in-between after design finalization to start the Production |
Total Project Timeline till handover for estimated work |
Painting & other works |
|
6-8 lac |
7 working days |
45 working Days |
8-10 working Days |
|
8-12 lac |
7 working days |
55 working Days |
10-12 working Days |
|
12-15 lac |
7 working days |
65 working Days |
15-17 working Days |
|
15-20 lac |
7 working days |
75 working Days |
18-20 working days |
|
20-25 lac |
7 working days |
85 working Days |
25 working days |
*Inner Design will keep 15 working days of buffer time for unconditional foreseen situations.
*Inner Design won’t be responsible for any delay in project implementation due to third party vendors or for reasons beyond its control.